Making use of a rainy Saturday

by Irma Havlicek
Powerhouse Museum Online Producer

The completed drawing frame
The completed drawing frame (see below) © PHM; photo by Irma Havlicek

Yesterday, Saturday 17 November 2012, we received the news at breakfast that, due to heavy rain overnight, and with further rain forecast, yesterday’s work on site for most of us was cancelled. However, there were still tasks for all of us.

Steve Vassilakis and Hugh Thomas headed out on a fishing boat to the coast below the site of Zagora to investigate potential landing sites around Zagora. This was to inform considerations about how ancient mariners may have landed here in the past. Steve had been liaising with fishermen at Batsi over recent weeks to arrange this trip, and used his extensive fishing (including commercial fishing) experience to help with this project. Hugh photographed the venture from the boat (and succeeded in keeping sea-sickness at bay).

My travel pals from last weekend (see my posts about our visit to Delos and Mykonos), Paul Donnelly and Rudy Alagich, braved the wet conditions and went down to the site with Bob Miller, a photographer who arrived last night to document work on the project.

There will be a post soon on what they found….

However, back at base here at the Kantouni Pensione, time was not wasted.

Hannah Morris (left) helps Archondia Thanos to string up a drawing frame
Hannah Morris (left) helps Archondia Thanos to string up a planning frame © PHM; photo by Irma Havlicek

Lesley Beaumont had an extensive (three and a half hours!) briefing session with the test trench supervisors, Kristen Mann and Ivana Vetta, and Andrew Wilson, whose role is to bring all the digital data from the survey and excavation into the Heurist database system devised for the Zagora Archaeological Project.

Archondia Thanos went shopping to purchase materials with which to string two planning frames which Lesley Beaumont had brought from Chios. Then Archondia, assisted by Hannah Morris, a volunteer student who also arrived last night, strung the two frames.

Hannah Morris (left) helps Archondia Thanos to string up a drawing frame
Hannah Morris (left) helps Dr Archondia Thanos to string up a planning frame © PHM; photo by Irma Havlicek

These are 1 metre by 1 metre wooden frames, with string pulled taut every 10 cm. These planning frames will be placed on the test trenches (and later, other trenches) to enable drawing/documenting of what is found as each level is excavated.

This means that we will have something like a ‘zoomable’ picture of the site. The overall site with the 15 x 100 metre square grids, divided up into 217 x 20 metre square grids, within which there will be 5 metre square excavation trenches, within which the archaeologists will use the 1 metre square planning frame to draw the details of what is found in the trenches within 10 cm squares.

And I used my time to work on posts for this blog.

Hannah Morris (left) helps Archondia Thanos to string up a drawing frame
Hannah Morris (left) helps Archondia Thanos to string up a planning frame. My laptop, at my usual working place (where wifi signal strength is best inside) is visible in the lower right of the picture © PHM; photo by Irma Havlicek

More from the Dig Blog

Zagora dig blog
Catherine Mellor

It’s a Wrap, Season Finale !

After six incredible weeks the 2024 Zagora Archaeological Project field season is coming to a conclusion this weekend as we prepare to say farewell to our second group of students and to many of our field specialists.

Read More »
Zagora dig blog
Catherine Mellor

Zagora Site Open Day Success

On Monday October 28th the Zagora Archaeological Project as part of its community outreach and engagement, held a public open day event. We were very gratified to receive and welcome approximately seventy people on a lovely autumn afternoon.

Read More »

1 thought on “Making use of a rainy Saturday”

Leave a Comment